All Agency

Data & Dashboards

数据看板、自动报表、指标系统、经营驾驶舱、数据检索和异常提醒。

data-dashboards.solocore.cn
Data & Dashboards

Data & Dashboards

A business flow translated into screens the team can operate.

Screens??
Roles??
FlowStatus -> Action -> Record
01

Data & Dashboards entry

North Star KPI

02

Proof close to the claim

决策问题

03

Operating screens

Microsoft Learn Power BI Dashboard Design Tips

The operating model becomes visible: who enters, what they see, what changes state, and how the result is checked.

Page system

The useful parts are screens, states, roles, and proof of movement.

01

Data & Dashboards entry

A business flow translated into screens the team can operate.

Hero01

Data & Dashboards entry

North Star KPI

North Star KPI一屏显示核心结果、同比/环比、目标差距和异常。
漏斗从访问、线索、跟进、报价到成交,看掉点和负责人。
分组下钻渠道、产品、地区、负责人和时间范围可切换。
02

Proof close to the claim

The operating model becomes visible: who enters, what they see, what changes state, and how the result is checked.

Proof02

Proof close to the claim

决策问题

决策问题每张看板服务一个业务问题,不做指标堆叠。
指标字典每个指标都有公式、来源、更新时间和负责人。
数据模型清洗、去重、权限过滤和时间维度先在模型层处理。
03

Operating screens

The important surfaces are shown as pages, panels, states, and handoff points.

Screens03

Operating screens

Microsoft Learn Power BI Dashboard Design Tips

Microsoft Learn Power BI Dashboard Design Tips用于仪表盘信息层级、指标组织、视觉简化和一屏决策体验。
shadcn/ui Charts用于看板图表、指标卡、数据解读和 UI 组件组合参考。
PostHog Product Analytics用于事件、漏斗、留存、产品验证和 MVP 迭代指标参考。

After / Before

From a loose process to a visible business system.

Before

Work lives in spreadsheets, messages, and memory.

  • No single owner
  • No shared status
  • Manual reporting
  • Hard to audit
After

The process has pages, permissions, status, and a repeatable path.

  • Operational screens
  • Role boundaries
  • Visible history
  • Next action clear

Connected work

Where this service becomes a real surface.

Benchmarks

Microsoft Learn Power BI Dashboard Design TipsNIST Cybersecurity FrameworkOWASP API Security Top 10 2023W3C WCAG 2.2 Quick Reference

Contact Sales

Bring the current process, the people who touch it, and the screen that needs to replace the spreadsheet.

Start a Project